Modular and portable buildings
Ask each supplier for the external dimensions and wall-panel build-up of the quoted model. Calculate the loading plan per order from package dimensions and lifting limits. Confirm how the completed module is secured for its route.
MEP preinstallation can stop at conduit and sleeves, or include sanitary pods. The factory and site split is listed line by line so a missing water heater is not discovered after the crane leaves.